Analysis of Best Practices to Prevent and Manage the Waste Generated in Building Rehabilitation Works
| dc.contributor.author | Villoria Sáez, Paola | |
| dc.contributor.author | Río Merino, Mercedes del | |
| dc.contributor.author | Porras Amores, César | |
| dc.contributor.author | Santa Cruz Astorqui, Jaime | |
| dc.contributor.author | González Pericot, Natalia | |
| dc.date.accessioned | 2021-06-24T17:30:35Z | |
| dc.date.available | 2021-06-24T17:30:35Z | |
| dc.date.issued | 2019 | |
| dc.description.abstract | This paper carries out a survey conducted among the construction agents in order to evaluate the effectiveness and viability of several best practice measures regarding construction and demolition waste (CDW) management in building rehabilitation works. This survey was developed considering that in rehabilitation works two well differentiated activities are carried out: those of the dismantling of the building (deconstruction activities) and those of the execution of the new construction (construction activities). Results of this survey show that among the highly rated best practices for the design phase “designing the building in order to help the recovery of the materials at the end of its use” can be highlighted, despite less than 25% of respondents usually implement this measure in their works. Moreover, according to BP during the construction phase, the results reveal that only 70% of respondents routinely implement the most valued measure “Hiring authorized companies for the management of CDW” and 60% the second “Respecting the manufacturer’s directions regarding the transport, collection and commissioning”. | spa |
| dc.description.filiation | UEM | spa |
| dc.description.impact | 2.576 JCR (2019) Q2, 53/123 Environmental Studies | spa |
| dc.description.impact | 0.581 SJR (2019) Q2, 90/930 Energy Engineering and Power Technology | spa |
| dc.description.impact | No data IDR 2019 | spa |
| dc.description.sponsorship | Ministerio de Asuntos Económicos y Transformación Digital (BIA2013-43061-R). | spa |
| dc.identifier.citation | Villoria Sáez, P., Río Merino, M., Porras-Amores, C., Santa Cruz Astorqui, J., & González Pericot, N. (2019). Analysis of best practices to prevent and manage the waste generated in building rehabilitation works. Sustainability, 11(10), 2796. https://doi.org/10.3390/su11102796 | spa |
| dc.identifier.doi | 10.3390/su11102796 | |
| dc.identifier.issn | 2071-1050 | |
| dc.identifier.uri | http://hdl.handle.net/11268/10192 | |
| dc.language.iso | eng | spa |
| dc.peerreviewed | Si | spa |
| dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 Internacional | * |
| dc.rights.accessRights | open access | spa |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
| dc.subject.unesco | Gestión ambiental | spa |
| dc.subject.unesco | Industria de la construcción | spa |
| dc.subject.unesco | Renovación urbana | spa |
| dc.title | Analysis of Best Practices to Prevent and Manage the Waste Generated in Building Rehabilitation Works | spa |
| dc.type | journal article | spa |
| dspace.entity.type | Publication | |
| relation.isAuthorOfPublication | 4bc666f5-1b8b-4c06-8153-67639118eea5 | |
| relation.isAuthorOfPublication.latestForDiscovery | 4bc666f5-1b8b-4c06-8153-67639118eea5 |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- Pericot_sus_2019.pdf
- Size:
- 1.2 MB
- Format:
- Adobe Portable Document Format
- Description:
- Versión del editor

